Events unfold on the construction of the Baikal-Amur Mainline (BAM), in the survey party and in the village of Kamushki, through which the highway is to pass.
2020
2002
2015
1988
1996
2025
2016
2013
1989
2018
2021
2009
2022
1984
2019
2012
2001