Events unfold on the construction of the Baikal-Amur Mainline (BAM), in the survey party and in the village of Kamushki, through which the highway is to pass.
2020
2011
1985
1980
2002
1997
2018
2016
2015
1964
2004
1984
1988
1977
2013
1996
1989